quincy
Member
Finally, I got some free time to do some more to my transport box project. I got the sheet metal folded in a fold press so all I had to do was weld on the side plates. the 'bucket' is made out of 3mm mild steel. The sub frame is made of 10mm X 60mm flat bar. Did some work on the sub frame this evening. Heres a few photos of the progress.
Next step is to do some more drilling and get the subframe squared up and all welded up.
Next step is to do some more drilling and get the subframe squared up and all welded up.